close
MENU
2 mins to read

NZOG pledges support for Pike River Coal

Cornerstone investor New Zealand Oil and Gas is expected to cough up for Pike River Coal, which will announce a capital raising plan in the next few weeks.
Working capital is needed for operations in the first half of the year, after delays and difficult

Andrea Deuchrass
Fri, 29 Jan 2010
© All content copyright NBR. Do not reproduce in any form without permission, even if you have a paid subscription.

Cornerstone investor New Zealand Oil and Gas is expected to cough up for Pike River Coal, which will announce a capital raising plan in the next few weeks.

Working capital is needed for operations in the first half of the year, after delays and difficulties getting through a rock graben.

The company expects roadways through the graben to be complete by early February. Its first export of 20,000 tonnes of premium hard coking coal, worth $3.4 million, departs Lyttelton in February, to an Indian customer.

New Zealand Oil and Gas (NZX: NZO) holds a 29.6% stake in the company (NZX: PRC) and chief executive David Salisbury said this morning an announcement was expected “in due course”.

NZOG released its quarterly report and cashflow statement this morning, showing the company’s cash balance as of December 31 at $176.4 million – 80% of which was held in US dollar accounts with major New Zealand banks.

During the quarter it spent $9.8 million on exploration, mostly on "disappointing" Albacore.

Mr Salisbury said it would spend about $30 million over the summer months, including the cost of drilling Albacore, which had now been plugged and abandoned after only traces of hydrocarbons were found.

NZOG would use test results to get a better view of prospectivity in the remaining area, he said.

It is now waiting on the Kan Tan IV semi-submersible rig to arrive (expected in late February) so it can spud the "relatively high-risk" 300-metre deep Hoki well, offshore from Taranaki. NZOG has a 10% stake in the Hoki permit.

The Kan Tan would then move on to at least two further wells in the Tui field.

NZOG recorded operating revenue of $15.6 million from Tui in the quarter, with the average price received per barrel sold $US73. Production for the quarter was 1.3 million barrels.

Operating revenue and expenditure from Kupe was not available during the initial commissioning stages (when income and expenditure is capitalised).

Kupe, the $1.3 billion project that NZOG has a 15% stake in, produced the first raw gas stream in December, which was piped to a processing plant in south Taranaki.

By the end of the month, it had supplied Genesis Energy with 110 terajoules of gas, along with 50 tonnes of LPG to Vector. Once in full production, Kupe is expected to supply 10% to 15% of the country’s annual gas requirements.

NZOG has withdrawn from a study group considering bidding in Romania, however Mr Salisbury said it was “still on the radar”.

He said the company was looking at a number of offshore opportunities “spread across the globe”.

While Australia presented opportunities, it was a difficult place to do business, with a number of “smart people who have worked Australia for a long time”.

The company intends to farm out stakes in its Gamma (now 100% owned) and Barque (40%) permits.

Andrea Deuchrass
Fri, 29 Jan 2010
© All content copyright NBR. Do not reproduce in any form without permission, even if you have a paid subscription.

Free News Alerts

Sign up to get the latest stories and insights delivered to your inbox – free, every day.

I’m already subscribed/joined

Free News Alerts

Sign up to get the latest stories and insights delivered to your inbox – free, every day.

I’m already subscribed/joined
NZOG pledges support for Pike River Coal
2029
false