close
MENU
1 mins to read

Tenders open for SH1 from Otaki to Levin

Tenders are open for work on the Otaki to Levin section of the Wellington Northern Corridor of State Highway 1, Transport Minister Steven Joyce says.Tenders are being called for options and preliminary design for the 21km section."The Otaki to Levin

NZPA
Mon, 27 Sep 2010

Tenders are open for work on the Otaki to Levin section of the Wellington Northern Corridor of State Highway 1, Transport Minister Steven Joyce says.

Tenders are being called for options and preliminary design for the 21km section.

"The Otaki to Levin route is an integral component of the Wellington Northern Corridor which, when completed, will provide faster and safer travel, as well as enhanced journey time reliability for motorists travelling from across the lower North Island to Wellington and the airport," Mr Joyce said.

The release today of tender documents for the section was an important step towards getting the expressway designed and built so that these benefits can be realised, he said.

Tenders close late October and are likely to be awarded before Christmas.

NZPA
Mon, 27 Sep 2010
© All content copyright NBR. Do not reproduce in any form without permission, even if you have a paid subscription.
Tenders open for SH1 from Otaki to Levin
8854
false